Current Public Works Projects
2023-13
Corvallis Road Waterline
This project will replace existing undersized waterlines and extend the waterline south to the new Water Treatment Plant.
2023-12
Chestnut Street Bridge
This project is funded through a grant by the federal government will design and construct the Chestnut Street crossing of the south fork of Ash Creek connecting existing neighborhoods to 13th Street.
2023-11
Parks Master Plan
This project will update the 2015 Parks Master Plan and determine park infrastructure needs for the next 20 years.
2023-09
Road Jurisdiction Transfer
This project will annex roadways within the city urban growth boundary, including portions of Monmouth Street, E Street, Talmadge Road, 13th Street, Gun Club Road, and Stryker Road. This will allow the city to control the development of those roadways in the future.
2023-06
Stormwater Master Plan
This project will update the 2005 Stormwater Master Plan and determine stormwater infrastructure needs for the next 20 years.
2023-04
Water Treatment Plant
This project will design and construct a new water intake, water treatment plant, pumping system and 2MG reservoir which will meet the city’s drinking water requirements for the next 20 years.
2022-17
9th Street Pump Station Phase 2 & 3
This project is funded through a grant by the State of Oregon and will address sewer pumping and transmission to the wastewater treatment plant needs for the next 20 years.
2022-13
Sunset Park
This project will include the installation of a nature play style playground, park trees, benches, and other park amenities.
2022-12
OR 51 (Monmouth St)-5th Street Safe Routes to Schools
This project will provide an enhanced pedestrian crossing at the intersection of 5th Street and Monmouth Street.
2022-09
Wastewater Treatment Plant Upgrade
This project will install a new screened headworks, piping between lagoons, aeration in the lagoons to improve treatment and water quality, and upgrade the existing disinfection system.