Current Public Works Projects

2023-13

Corvallis Road Waterline

This project will replace existing undersized waterlines and extend the waterline south to the new Water Treatment Plant.

2023-12

Chestnut Street Bridge

This project is funded through a grant by the federal government will design and construct the Chestnut Street crossing of the south fork of Ash Creek connecting existing neighborhoods to 13th Street.

2023-11

Parks Master Plan

This project will update the 2015 Parks Master Plan and determine park infrastructure needs for the next 20 years.

2023-09

Road Jurisdiction Transfer

This project will annex roadways within the city urban growth boundary, including portions of Monmouth Street, E Street, Talmadge Road, 13th Street, Gun Club Road, and Stryker Road. This will allow the city to control the development of those roadways in the future.

2023-06

Stormwater Master Plan

This project will update the 2005 Stormwater Master Plan and determine stormwater infrastructure needs for the next 20 years.

2023-04

Water Treatment Plant

This project will design and construct a new water intake, water treatment plant, pumping system and 2MG reservoir which will meet the city’s drinking water requirements for the next 20 years.

2022-17

9th Street Pump Station Phase 2 & 3

This project is funded through a grant by the State of Oregon and will address sewer pumping and transmission to the wastewater treatment plant needs for the next 20 years.

2022-13

Sunset Park

This project will include the installation of a nature play style playground, park trees, benches, and other park amenities.

2022-12

OR 51 (Monmouth St)-5th Street Safe Routes to Schools

This project will provide an enhanced pedestrian crossing at the intersection of 5th Street and Monmouth Street.

2022-09

Wastewater Treatment Plant Upgrade

This project will install a new screened headworks, piping between lagoons, aeration in the lagoons to improve treatment and water quality, and upgrade the existing disinfection system.

2018-03

Polk Well #4

This project will design and construct the final well in the Polk Wellfield located at the north end of the Riverfront Park.