Current Public Works Projects

2023-13

Corvallis Road Waterline

This project will replace existing undersized waterlines and extend the waterline south to the new Water Treatment Plant.

2023-12

Chestnut Street Bridge

This project is funded through a grant by the federal government will design and construct the Chestnut Street crossing of the south fork of Ash Creek connecting existing neighborhoods to 13th Street.

2023-11

Parks Master Plan

This project will update the 2015 Parks Master Plan and determine park infrastructure needs for the next 20 years.

2023-09

Road Jurisdiction Transfer

This project will annex roadways within the city urban growth boundary to allow the city to control the development of those roadways in the future.

2023-08

Water System Development Charge and Water Rates Update

This project will update the system development charge (SDC) methodology allowing the city to set correct SDC fees for water. The city will also be preparing a water rate analysis for the next 5 years.

2023-06

Stormwater Master Plan

This project will update the 2005 Stormwater Master Plan and determine stormwater infrastructure needs for the next 20 years.

2023-05

Riverview Pathway Repair

This project will realign the existing pathway in Riverfront Park north of the foot bridge away from Ash Creek.

2023-04

Water Treatment Plant

This project will design and construct a new water intake, water treatment plant, pumping system and 2MG reservoir which will meet the city’s drinking water requirements for the next 20 years.

2022-17

9th Street Pump Station Phase 2 & 3

This project is funded through a grant by the State of Oregon and will address sewer pumping and transmission to the wastewater treatment plant needs for the next 20 years.

2022-14

C Street Sewer Replacement

This project will replace the sewer main and laterals on C Street from 2nd Street to 7th Street. The project will be constructed in two phases and will address ongoing groundwater infiltration issues.

Bid Results for Project

2022-13

Sunset Park

This project will include the installation of a nature play style playground, park trees, benches, and other park amenities.

Park Plan Outline

2022-12

OR 51 (Monmouth St)-5th Street Safe Routes to Schools

This project will provide an enhanced pedestrian crossing at the intersection of 5th Street and Monmouth Street.

2022-09

Wastewater Treatment Plant Upgrade

This project will install a new screened headworks, piping between lagoons, aeration in the lagoons to improve treatment and water quality, and upgrade the existing disinfection system.

2019-02

9th Street Pump Station Phase 1

This project will design and construct an upgrade to the existing pump station at 9th Street including power and control upgrades.

2018-03

Polk Well #4

This project will design and construct the final well in the Polk Wellfield located at the north end of the Riverfront Park.

Bid Results for Project